A deck is the most permit-sensitive outdoor project a homeowner takes on — footings below frost line, ledger attachment to the house, and railings are all inspected, and all three are where cheap bids cut corners. In New England the frost depth alone separates a real bid from a guess.
A 300 sq ft scope at a mid-range finish, with each metro's cost factor applied and a 10% contingency included. Estimates for budgeting, not quotes.
| Metro | Low | Likely | High |
|---|---|---|---|
| Boston, MA1.12× metro factor | $22k | $36k | $58k |
| Worcester, MA0.94× metro factor | $17k | $28k | $45k |
| Providence, RI1.02× metro factor | $17k | $29k | $46k |
| Hartford, CT0.98× metro factor | $17k | $28k | $45k |
| Manchester, NH1.00× metro factor | $16k | $26k | $42k |
| Portland, ME1.06× metro factor | $16k | $27k | $43k |
| Cambridge, MA1.14× metro factor | $22k | $37k | $59k |
| Lowell, MA0.96× metro factor | $19k | $31k | $50k |
| Springfield, MA0.90× metro factor | $15k | $25k | $41k |
| Stamford, CT1.10× metro factor | $19k | $32k | $51k |
| New Haven, CT0.99× metro factor | $17k | $28k | $45k |
| Portsmouth, NH1.05× metro factor | $16k | $27k | $43k |
| Nashua, NH1.01× metro factor | $16k | $26k | $42k |
| Bangor, ME0.93× metro factor | $14k | $23k | $36k |
| Burlington, VT1.03× metro factor | $16k | $26k | $42k |
| South Portland, ME1.03× metro factor | $16k | $26k | $42k |
| Westbrook, ME1.00× metro factor | $15k | $25k | $40k |
| Scarborough, ME1.04× metro factor | $16k | $26k | $42k |
| Falmouth, ME1.07× metro factor | $16k | $27k | $43k |
| Cape Elizabeth, ME1.08× metro factor | $16k | $27k | $44k |
| Biddeford, ME0.98× metro factor | $15k | $25k | $40k |
| Saco, ME0.99× metro factor | $15k | $25k | $40k |
| Brunswick, ME0.99× metro factor | $15k | $25k | $40k |
| Gorham, ME0.99× metro factor | $15k | $25k | $40k |
| Windham, ME0.98× metro factor | $15k | $25k | $40k |
| Yarmouth, ME1.05× metro factor | $16k | $27k | $42k |
| Freeport, ME1.02× metro factor | $15k | $26k | $41k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Almost always, yes, once the deck attaches to the house or sits more than a couple of feet above grade. Footing and final inspections are standard. An unpermitted deck is a real problem at resale and with insurance if someone is hurt on it.
For most New England homeowners, yes on maintenance alone: no staining cycle and better resistance to freeze-thaw. The tradeoffs are heat retention in summer sun and a higher upfront line, plus the framing requirement of tighter joist spacing that should appear in the quote.