Electrical panel upgrade cost in Burlington

Priced per job, using Our Haus baseline unit costs with the labor share adjusted to Vermont and Burlington-area wages for the trade (BLS wage data) and the materials share adjusted by BLS producer price indexes. These are budgeting estimates, not quotes.

Source: Our Haus baseline estimates, adjusted with BLS wage and producer price data for the Burlington area.
Burlington electrical panel upgradeLowLikelyHigh
Electrical panel upgradeone 200-amp service upgrade$1.8k$3.2k$6.1k

Source: Our Haus baseline estimates, adjusted with BLS wage and producer price data for the Burlington area.

Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.

  • Electrical panel upgrade: Utility coordination, a new mast and meter socket, or moving the panel out of a bathroom or closet are what separate a $2k job from a $6k one.

What drives the price in Burlington

Late-1800s and early-1900s homes in the Old North End and Hill Section, post-war capes in the New North End, and lakefront properties where shoreland rules apply. Much of the stock predates modern insulation entirely, which shapes what renovations actually include here.

Service entrance
A new meter socket, mast or service cable adds materials and coordination. Whether these are needed is the biggest swing in price.
Panel location
Code doesn't allow panels in some spots, such as bathrooms or clothes closets. Moving the panel adds wiring work.
Utility scheduling
The utility has to disconnect and reconnect power. Their schedule often sets the install date.
Old wiring
Circuits that can't be safely moved as-is — for example old cloth-insulated wiring — may need replacement, which should be priced separately.

Common Burlington neighborhoods where this work comes up: Old North End, Hill Section, New North End, South End, Five Sisters.

Permits and rules in Burlington

Authority: City of Burlington Department of Permitting and Inspections

Building permit plus trade permits. Burlington runs its own energy-code and zoning review on renovations, and work near the lake can trigger state shoreland rules. Historic-review overlays apply in several neighborhoods.

Vermont contract and licensing rules

Vermont requires residential contractors to register with the Office of Professional Regulation for jobs over $10,000 — check the registration before signing. Registered contractors must also use a written contract for those jobs; below that line there is no state written-contract rule, so a written scope, payment schedule, and change-order clause are the homeowner's own protection.

Timeline and season in Burlington

The shortest practical building season in the region. Foundations and framing push for completion before the ground freezes, exterior work runs May through October, and the spring booking queue is real — plan additions a full year out.

Typical duration: Usually one day of work, with power off for part of it.

  1. 1
    Assessment · 1 visit

    Load, existing panel, service entrance and location are checked.

  2. 2
    Permit and utility · Varies

    Electrician pulls the permit and schedules the utility disconnect.

  3. 3
    Install · Usually one day

    Power is off while the panel is replaced and circuits moved over.

  4. 4
    Inspection and reconnect · Varies

    Town inspection, then the utility restores power.

What's included — and what usually isn't

A panel upgrade usually means moving to 200-amp service, the size most modern homes need for heat pumps, electric cooking, car chargers and additions. The range here is for one 200-amp service upgrade. Work on the utility side and moving the panel are what push a job to the top.

Typically included

  • • New panel and main breaker
  • • Transfer of existing circuits to the new panel
  • • Grounding and bonding brought up to current code
  • • Permit, inspection, and coordination with the utility for disconnect and reconnect

Usually excluded

  • • New circuits beyond those transferred, unless stated
  • • Wall or ceiling repair after the work
  • • Utility charges, if the utility bills separately

What a complete Burlington estimate spells out

  • • Panel brand, size in amps and number of spaces
  • • Whether the meter socket, mast or service cable is replaced
  • • Grounding and bonding work included
  • • Who handles the permit and the utility
  • • A price for replacing any circuits that can't be moved safely

Full checklist: what should be in a contractor's estimate.

Looking for a electrical panel upgrade contractor in Burlington?

We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Vermont registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.

Run a Burlington contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.

Have a Burlington quote in hand?

Run it through the quote range checker. We compare it against the Vermont cost index, flag line items that look high, and review the contract against Vermont home-improvement rules.

Check my quote

Electrical panel upgrade in Burlington — common questions

Do I need 200 amps?

Many homes adding heat pumps, an electric range or a car charger do. An electrician can do a load calculation to check what your home needs now and later.

Will my power be off?

Yes, for part of the install day while the utility disconnects and the panel is swapped. Plan for fridges and anything on medical power.