Home addition contractors in New England

An addition is new construction attached to an existing building, which means it carries every trade at once plus the hardest part — tying new structure, roof, and systems into old ones that were never built to current code.

Mid-range cost by metro

A 400 sq ft scope at a mid-range finish, with each metro's cost factor applied and a 10% contingency included. Estimates for budgeting, not quotes.

Metro
MetroLowLikelyHigh
Boston, MA1.12× metro factor$178k$242k$323k
Worcester, MA0.94× metro factor$136k$186k$248k
Providence, RI1.02× metro factor$139k$190k$254k
Hartford, CT0.98× metro factor$138k$188k$250k
Manchester, NH1.00× metro factor$128k$175k$233k
Portland, ME1.06× metro factor$131k$178k$238k
Cambridge, MA1.14× metro factor$181k$246k$329k
Lowell, MA0.96× metro factor$152k$208k$277k
Springfield, MA0.90× metro factor$124k$169k$226k
Stamford, CT1.10× metro factor$157k$214k$286k
New Haven, CT0.99× metro factor$137k$186k$248k
Portsmouth, NH1.05× metro factor$131k$178k$238k
Nashua, NH1.01× metro factor$130k$177k$236k
Bangor, ME0.93× metro factor$110k$150k$201k
Burlington, VT1.03× metro factor$127k$173k$231k
South Portland, ME1.03× metro factor$127k$173k$231k
Westbrook, ME1.00× metro factor$123k$168k$224k
Scarborough, ME1.04× metro factor$128k$175k$233k
Falmouth, ME1.07× metro factor$132k$180k$240k
Cape Elizabeth, ME1.08× metro factor$133k$182k$242k
Biddeford, ME0.98× metro factor$121k$165k$220k
Saco, ME0.99× metro factor$122k$167k$222k
Brunswick, ME0.99× metro factor$122k$167k$222k
Gorham, ME0.99× metro factor$122k$167k$222k
Windham, ME0.98× metro factor$121k$165k$220k
Yarmouth, ME1.05× metro factor$130k$177k$236k
Freeport, ME1.02× metro factor$126k$172k$229k

Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.

City guides

What a complete estimate spells out

  • • Whether design and engineering fees are inside or outside the price
  • • Foundation type and an allowance or unit price for ledge and unsuitable soils
  • • Who is responsible for zoning approvals and what happens if they are denied
  • • Window and door schedule with manufacturer and series
  • • How HVAC load was calculated and whether existing equipment can carry it
  • • A payment schedule tied to inspected milestones, not calendar dates
  • • Weather-protection responsibility during framing
Check a quote against regional pricing

Frequently asked questions

Is an addition cheaper than moving?

Sometimes. Compare the all-in addition cost — design, permits, construction, and the months of disruption — against transaction costs on a move, which typically run 8 to 10 percent of a sale price plus the price difference on the new house. In tight New England markets the addition often wins; in a soft market it often does not.

Do I need an architect?

For anything structural or anything requiring zoning relief, yes — and most municipalities will require stamped drawings for the permit anyway. A design-build contractor can supply this, but confirm who holds the stamp.