Brunswick sits at the northern edge of the Portland labor market, and pricing reflects it — close to the Maine average rather than the Portland premium. Contractors here often serve the Bath and Topsham corridor as well, so travel time is priced into smaller jobs.
Our Haus isn't a contractor directory. We give you the local cost math, the permit reality, and the paperwork tools — the scope, the proposal comparison, and the vault your records live in.
Based on a 150 sq ft kitchen remodel scope, adjusted by the Maine regional cost index and a Brunswick metro multiplier of 0.99×. A 10% contingency reserve is included. These are budgeting estimates, not quotes.
| Brunswick kitchen remodel | Low | Likely | High |
|---|---|---|---|
| Basic finishEntry-level materials, no layout change | $25k | $33k | $46k |
| Mid-range finishThe most common scope | $46k | $62k | $83k |
| High-end finishCustom materials and detail | $83k | $117k | $167k |
Source: Our Haus cost engine — per-square-foot bands from public industry data (Cost vs. Value, NAHB, RSMeans-derived regional indices), adjusted for Maine and the Brunswick metro.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
| Line item | Low | Likely | High |
|---|---|---|---|
| Cabinets | $12k | $16k | $22k |
| Countertops | $4.2k | $5.7k | $7.6k |
| Appliances | $5.8k | $8.0k | $11k |
| Flooring | $2.9k | $4.0k | $5.3k |
| Plumbing & fixtures | $3.3k | $4.5k | $6.1k |
| Electrical & lighting | $2.5k | $3.4k | $4.5k |
| Drywall, paint, trim | $2.5k | $3.4k | $4.5k |
| Labor (general) | $6.7k | $9.1k | $12k |
| Permits & design | $1.7k | $2.3k | $3.0k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Federal and Greek Revival homes on and near Federal Street and Park Row, mill-era housing near the Androscoggin, mid-century neighborhoods around the former naval air station, and newer building at Brunswick Landing. The historic stock is genuinely old — expect plaster, original framing, and lead paint.
Common Brunswick neighborhoods where this work comes up: Federal Street Historic District, Brunswick Landing, Maine Street, Pleasant Hill, Mere Point.
Authority: Town of Brunswick Codes Enforcement Department
Building permit plus zoning review; trades pull electrical and plumbing separately. Exterior work in the Federal Street and Park Row historic districts goes through additional review. Shoreland zoning applies along the Androscoggin and out toward Mere Point and Simpsons Point.
Maine requires a written contract for home-construction or repair work over $3,000. The contract must include the contractor's name and address, the work and materials, the total price, a payment schedule, start and completion dates, a warranty statement, and notice of the state's contractor-dispute mediation program. Maine does not license general contractors, so verify insurance directly with the carrier.
April through November for exterior work, with the spring queue filling early. Winters here are slightly harder than on the immediate coast, so weather protection for open framing is a real budget line.
Typical duration: 8–14 weeks on site once materials are in hand.
Layout, cabinet order, and every finish selection. Cabinet lead time drives the whole schedule — order before demolition.
Building permit plus separate electrical and plumbing permits. Historic-district review, where it applies, sits in front of this.
The scope-change window. Anything hidden — rot, old wiring, undersized framing — surfaces here.
Framing changes, plumbing and electrical rough, inspections before anything is closed up.
Board, tape, prime. Dust travels through the whole house during this phase.
Cabinets install, then counters are templated and fabricated — usually a 1–2 week gap before the stone arrives.
Backsplash, appliances, trim, lighting, final inspections, and the punch list.
A full kitchen remodel replaces cabinets, counters, appliances, flooring, and lighting, and usually touches plumbing and electrical. The spread between a modest refresh and a gut renovation with a moved wall is the widest of any room in the house.
Full checklist: what should be in a contractor's estimate.
We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Maine registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.
Run a Brunswick contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.
Run it through the quote range checker. We compare it against the Maine cost index, flag line items that look high, and review the contract against Maine home-improvement rules.
Check my quoteYes. Cabinet lead times commonly run six to twelve weeks, and demolishing a working kitchen before the cabinets are in the shop turns a schedule gap into weeks without a kitchen.
Industry cost-versus-value data consistently shows minor and mid-range kitchen remodels recovering a larger share of their cost than high-end ones. A $30,000 refresh usually returns a better ratio than a $120,000 gut, even though the gut may be the right call for how you live.