Kitchen remodeling contractors in Burlington, VT

Burlington is Vermont's priciest renovation market: a small contractor pool, strong demand, and a short building season. Winter energy-performance work — insulation, air sealing, heat pumps — is a larger share of scopes here than anywhere else in New England.

Our Haus isn't a contractor directory. We give you the local cost math, the permit reality, and the paperwork tools — the scope, the proposal comparison, and the vault your records live in.

Kitchen remodel cost in Burlington

Based on a 150 sq ft kitchen remodel scope, adjusted by the Vermont regional cost index and a Burlington metro multiplier of 1.03×. A 10% contingency reserve is included. These are budgeting estimates, not quotes.

Source: Our Haus cost engine — per-square-foot bands from public industry data (Cost vs. Value, NAHB, RSMeans-derived regional indices), adjusted for Vermont and the Burlington metro.
Burlington kitchen remodelLowLikelyHigh
Basic finishEntry-level materials, no layout change$26k$35k$48k
Mid-range finishThe most common scope$48k$65k$87k
High-end finishCustom materials and detail$87k$121k$173k

Source: Our Haus cost engine — per-square-foot bands from public industry data (Cost vs. Value, NAHB, RSMeans-derived regional indices), adjusted for Vermont and the Burlington metro.

Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.

Where the money goes (mid-range finish)

Line item
Line itemLowLikelyHigh
Cabinets$13k$17k$23k
Countertops$4.3k$5.9k$7.9k
Appliances$6.1k$8.3k$11k
Flooring$3.0k$4.1k$5.5k
Plumbing & fixtures$3.5k$4.7k$6.3k
Electrical & lighting$2.6k$3.5k$4.7k
Drywall, paint, trim$2.6k$3.5k$4.7k
Labor (general)$6.9k$9.5k$13k
Permits & design$1.7k$2.4k$3.2k

Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.

What drives the price in Burlington

Late-1800s and early-1900s homes in the Old North End and Hill Section, post-war capes in the New North End, and lakefront properties where shoreland rules apply. Much of the stock predates modern insulation entirely, which shapes what renovations actually include here.

Cabinet tier
Cabinets are typically the single largest line item — often close to a third of the job. Moving from stock to semi-custom to full custom can double the cabinet line by itself.
Layout changes
Keeping sink, range, and refrigerator in place is the cheapest kitchen you can build. Moving the sink means new supply and waste runs; moving a gas range means a new gas line and often a new vent path.
Wall removal
Opening a kitchen to a living space usually means a load-bearing header, temporary shoring, and an engineer's letter for the permit. In older homes it also means finding out what is inside the wall.
Electrical service
Older homes frequently cannot support an induction range, a wall oven, and a microwave without a panel upgrade. That is a separate line item and a separate permit.
Countertop material
Laminate, butcher block, quartz, and natural stone span a wide range, and stone adds template and fabrication lead time between demo and finish.

Common Burlington neighborhoods where this work comes up: Old North End, Hill Section, New North End, South End, Five Sisters.

Permits and rules in Burlington

Authority: City of Burlington Department of Permitting and Inspections

Building permit plus trade permits. Burlington runs its own energy-code and zoning review on renovations, and work near the lake can trigger state shoreland rules. Historic-review overlays apply in several neighborhoods.

Vermont contract and licensing rules

Vermont requires residential contractors to register with the Office of Professional Regulation for jobs over $10,000 — check the registration before signing. There is no broad state written-contract mandate below that line, so a written scope, payment schedule, and change-order clause are the homeowner's own protection.

Timeline and season in Burlington

The shortest practical building season in the region. Foundations and framing push for completion before the ground freezes, exterior work runs May through October, and the spring booking queue is real — plan additions a full year out.

Typical duration: 8–14 weeks on site once materials are in hand.

  1. 1
    Design and selections · 2–6 weeks

    Layout, cabinet order, and every finish selection. Cabinet lead time drives the whole schedule — order before demolition.

  2. 2
    Permitting · 1–4 weeks

    Building permit plus separate electrical and plumbing permits. Historic-district review, where it applies, sits in front of this.

  3. 3
    Demolition · 2–4 days

    The scope-change window. Anything hidden — rot, old wiring, undersized framing — surfaces here.

  4. 4
    Rough-in · 1–2 weeks

    Framing changes, plumbing and electrical rough, inspections before anything is closed up.

  5. 5
    Drywall and paint prep · 1 week

    Board, tape, prime. Dust travels through the whole house during this phase.

  6. 6
    Cabinets and counters · 1–3 weeks

    Cabinets install, then counters are templated and fabricated — usually a 1–2 week gap before the stone arrives.

  7. 7
    Finishes and punch list · 1–2 weeks

    Backsplash, appliances, trim, lighting, final inspections, and the punch list.

What's included — and what usually isn't

A full kitchen remodel replaces cabinets, counters, appliances, flooring, and lighting, and usually touches plumbing and electrical. The spread between a modest refresh and a gut renovation with a moved wall is the widest of any room in the house.

Typically included

  • Demolition and disposal of existing cabinets, counters, and flooring
  • Cabinetry — stock, semi-custom, or custom, plus installation
  • Countertops, backsplash, and sink cutouts
  • Appliance rough-in and installation
  • Plumbing fixtures and any supply or waste relocation
  • Electrical: circuits for appliances, under-cabinet and ceiling lighting, code-required GFCI outlets
  • Flooring, drywall repair, trim, and paint

Usually excluded

  • Appliance purchase, when the contract lists it as an allowance rather than a supplied item
  • Structural work to remove a wall (priced separately once an engineer sizes the beam)
  • Panel upgrades required to add appliance circuits
  • Asbestos or lead abatement discovered during demolition

What a complete Burlington estimate spells out

  • Cabinet manufacturer, line, and door style — not just "new cabinets"
  • Countertop material and a square-foot figure, with edge profile named
  • Appliance allowance as a dollar figure, or the model numbers being supplied
  • Who supplies and who installs each item
  • Whether the price includes disposal, protection of adjacent rooms, and final cleaning
  • A change-order clause with a stated markup

Full checklist: what should be in a contractor's estimate.

Looking for a kitchen remodel contractor in Burlington?

We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Vermont registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.

Run a Burlington contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.

Have a Burlington quote in hand?

Run it through the quote range checker. We compare it against the Vermont cost index, flag line items that look high, and review the contract against Vermont home-improvement rules.

Check my quote

Kitchen remodel in Burlington — common questions

Should I order cabinets before demolition?

Yes. Cabinet lead times commonly run six to twelve weeks, and demolishing a working kitchen before the cabinets are in the shop turns a schedule gap into weeks without a kitchen.

Is a kitchen remodel worth it at resale?

Industry cost-versus-value data consistently shows minor and mid-range kitchen remodels recovering a larger share of their cost than high-end ones. A $30,000 refresh usually returns a better ratio than a $120,000 gut, even though the gut may be the right call for how you live.