Boston is one of the most expensive renovation markets in the country. Dense parcels, narrow streets, permit parking for dumpsters and deliveries, and a deep bench of union-scale trades all push labor above the Massachusetts average — often before a single material decision is made.
| Project | Low | Likely | High |
|---|---|---|---|
| Kitchen remodel150 sq ft, mid-range finish | $67k | $91k | $121k |
Massachusetts regional index with a 1.12× Boston metro factor, 10% contingency included. Budgeting estimates, not quotes.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Much of the city's housing predates 1940: South End and Back Bay brownstones, Dorchester and Jamaica Plain triple-deckers, and Victorians in Roslindale and West Roxbury. Expect knob-and-tube remnants, balloon framing, plaster-and-lath walls, cast-iron waste stacks, and lead paint in anything built before 1978 — all of which add scope that a per-square-foot average never captures.
Neighborhoods: Back Bay, South End, Jamaica Plain, Dorchester, Charlestown, South Boston.
Authority: City of Boston Inspectional Services Department (ISD)
Long-form building permits are required for structural work, additions, and most layout changes; short-form permits cover like-for-like interior work. Electrical and plumbing permits are pulled separately by the licensed trade. Landmark districts (Back Bay, Beacon Hill, South End, Bay Village, Mission Hill Triangle) add a Boston Landmarks Commission or district-commission review before exterior work, which routinely adds weeks to the front of a schedule.
Massachusetts requires a written contract for residential work over $1,000, and the contractor must be registered under the Home Improvement Contractor (HIC) program. The contract must state the total price, a payment schedule, start and completion dates, and the contractor's HIC registration number. Deposits are capped at one third of the total price (or the cost of special-order materials, whichever is greater).
Exterior work concentrates between April and November. Roofing shingles need surface temperatures above roughly 40°F to seal properly, so late-fall installs often run a hand-sealing step. Foundation and excavation work slows once the ground freezes, and spring is the busiest booking window — quotes issued in January are usually cheaper than the same scope quoted in May.
Check a Boston quote