Cambridge prices at the top of the Massachusetts market. Labor runs at or above Boston rates, lots are tight, and a large share of the housing sits inside historic or neighborhood-conservation districts that add review time to exterior work.
Our Haus isn't a contractor directory. We give you the local cost math, the permit reality, and the paperwork tools — the scope, the proposal comparison, and the vault your records live in.
Based on a 1,600 sq ft roof replacement scope, adjusted by the Massachusetts regional cost index and a Cambridge metro multiplier of 1.14×. A 10% contingency reserve is included. These are budgeting estimates, not quotes.
| Cambridge roof replacement | Low | Likely | High |
|---|---|---|---|
| Basic finishEntry-level materials, no layout change | $62k | $111k | $172k |
| Mid-range finishThe most common scope | $111k | $185k | $296k |
| High-end finishCustom materials and detail | $296k | $444k | $678k |
Source: Our Haus cost engine — per-square-foot bands from public industry data (Cost vs. Value, NAHB, RSMeans-derived regional indices), adjusted for Massachusetts and the Cambridge metro.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
| Line item | Low | Likely | High |
|---|---|---|---|
| Decking / paving materials | $32k | $54k | $86k |
| Structural framing | $18k | $30k | $48k |
| Railings & stairs | $10k | $17k | $27k |
| Footings | $10k | $17k | $27k |
| Labor | $26k | $44k | $70k |
| Permits | $4.0k | $6.7k | $11k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Triple-deckers and two-families dominate most of the city, with Victorian singles in West Cambridge and mid-rise conversions near the squares. Expect plaster walls, old steam and hydronic heat, undersized electrical panels, and — in pre-1978 housing — lead-safe work practices on any renovation.
Common Cambridge neighborhoods where this work comes up: Harvard Square, Kendall Square, Porter Square, West Cambridge, Cambridgeport, North Cambridge.
Authority: City of Cambridge Inspectional Services Department
Building, electrical, plumbing, and gas permits are separate and pulled by licensed trades where applicable. Exterior changes in historic districts require Historic Commission review before the permit issues, and demolition of any kind faces an extra review step for buildings over fifty years old.
Same Massachusetts rules as Boston: written contract over $1,000, Home Improvement Contractor registration, one-third deposit cap, and required start and completion dates in the contract.
Exterior work runs April through November. The contractor pool overlaps Boston entirely, so the spring booking rush is the same — interior work scheduled for January and February prices and starts best.
Typical duration: 1–4 days on site for a typical single-family.
Measurement, deck assessment, and a written scope. Insurance claims add an adjuster visit.
Most municipalities require a roofing permit for a full strip-and-replace.
Shingles are loaded onto the roof or staged in the driveway; site protection goes down.
Old roofing comes off in sections so nothing is left open overnight. Bad sheathing is replaced.
Ice-and-water, underlayment, drip edge, flashing, shingles, ridge.
Magnetic sweep for nails, debris removal, and a final walk with photos of flashing details.
A roof replacement in New England is as much about ice and water management as it is about shingles. The shingle line item is the easy part to compare between bids; the underlayment, ice-and-water coverage, flashing, and ventilation details are where bids actually differ.
Full checklist: what should be in a contractor's estimate.
We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Massachusetts registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.
Run a Cambridge contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.
Run it through the quote range checker. We compare it against the Massachusetts cost index, flag line items that look high, and review the contract against Massachusetts home-improvement rules.
Check my quoteCompare the underlayment and flashing lines, not the shingle brand. Ice-and-water coverage, whether step flashing is new or reused, the sheathing unit price, and the ventilation plan explain most of the spread.
It can be done when a roof is failing, but asphalt shingles need warm surfaces to seal. Cold-weather installs generally require hand-sealing tabs and cost more. Schedule April through November when you have the choice.