Boston is one of the most expensive renovation markets in the country. Dense parcels, narrow streets, permit parking for dumpsters and deliveries, and a deep bench of union-scale trades all push labor above the Massachusetts average — often before a single material decision is made.
Our Haus isn't a contractor directory. We give you the local cost math, the permit reality, and the paperwork tools — the scope, the proposal comparison, and the vault your records live in.
Based on a 1,800 sq ft siding replacement scope, adjusted by the Massachusetts regional cost index and a Boston metro multiplier of 1.12×. A 10% contingency reserve is included. These are budgeting estimates, not quotes.
| Boston siding replacement | Low | Likely | High |
|---|---|---|---|
| Basic finishEntry-level materials, no layout change | $61k | $109k | $169k |
| Mid-range finishThe most common scope | $109k | $182k | $291k |
| High-end finishCustom materials and detail | $291k | $436k | $666k |
Source: Our Haus cost engine — per-square-foot bands from public industry data (Cost vs. Value, NAHB, RSMeans-derived regional indices), adjusted for Massachusetts and the Boston metro.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
| Line item | Low | Likely | High |
|---|---|---|---|
| Decking / paving materials | $32k | $53k | $85k |
| Structural framing | $18k | $30k | $48k |
| Railings & stairs | $9.9k | $17k | $26k |
| Footings | $9.9k | $17k | $26k |
| Labor | $26k | $43k | $69k |
| Permits | $4.0k | $6.6k | $11k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Much of the city's housing predates 1940: South End and Back Bay brownstones, Dorchester and Jamaica Plain triple-deckers, and Victorians in Roslindale and West Roxbury. Expect knob-and-tube remnants, balloon framing, plaster-and-lath walls, cast-iron waste stacks, and lead paint in anything built before 1978 — all of which add scope that a per-square-foot average never captures.
Common Boston neighborhoods where this work comes up: Back Bay, South End, Jamaica Plain, Dorchester, Charlestown, South Boston.
Authority: City of Boston Inspectional Services Department (ISD)
Long-form building permits are required for structural work, additions, and most layout changes; short-form permits cover like-for-like interior work. Electrical and plumbing permits are pulled separately by the licensed trade. Landmark districts (Back Bay, Beacon Hill, South End, Bay Village, Mission Hill Triangle) add a Boston Landmarks Commission or district-commission review before exterior work, which routinely adds weeks to the front of a schedule.
Massachusetts requires a written contract for residential work over $1,000, and the contractor must be registered under the Home Improvement Contractor (HIC) program. The contract must state the total price, a payment schedule, start and completion dates, and the contractor's HIC registration number. Deposits are capped at one third of the total price (or the cost of special-order materials, whichever is greater).
Exterior work concentrates between April and November. Roofing shingles need surface temperatures above roughly 40°F to seal properly, so late-fall installs often run a hand-sealing step. Foundation and excavation work slows once the ground freezes, and spring is the busiest booking window — quotes issued in January are usually cheaper than the same scope quoted in May.
Typical duration: 1–3 weeks on site for a typical single-family.
Wall area, openings, and a teardown assessment of the existing cladding layers.
Fiber cement and special-order colors carry lead times; confirm before teardown.
Old siding off, sheathing inspected, repairs at the stated unit price.
The phase that decides whether the job lasts. Housewrap, tapes, pan flashing at openings.
Product installation with proper clearances at roofs, decks, and grade.
Siding is a weather-barrier job wearing a cosmetic costume. The product line on the bid matters less than the flashing, housewrap, and window-integration details underneath — and those are exactly the lines that disappear from the cheapest quote.
Full checklist: what should be in a contractor's estimate.
We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Massachusetts registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.
Run a Boston contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.
Run it through the quote range checker. We compare it against the Massachusetts cost index, flag line items that look high, and review the contract against Massachusetts home-improvement rules.
Check my quoteSometimes — over one sound layer of flat siding, with the right preparation, it is legal and can be reasonable. Over multiple layers, over rot, or where window flanges need re-flashing, strip it. Any honest answer requires looking at what is on the house now.
Quality vinyl and fiber cement are routinely rated for decades, and both handle freeze-thaw well when the weather barrier underneath is detailed correctly. Cedar performs beautifully but wants a maintenance cycle. The failure mode in New England is almost never the product — it is the flashing.