Brookline prices at the top of the Massachusetts market, alongside Cambridge. High finish expectations, older buildings, and a town-wide demolition review make careful planning part of the budget.
Our Haus isn't a contractor directory. We give you the local cost math, the permit reality, and the paperwork tools — the scope, the proposal comparison, and the vault your records live in.
Based on a 150 sq ft kitchen remodel scope, adjusted by the Massachusetts regional cost index and a Brookline metro multiplier of 1.14×. A 10% contingency reserve is included. These are budgeting estimates, not quotes.
| Brookline kitchen remodel | Low | Likely | High |
|---|---|---|---|
| Basic finishEntry-level materials, no layout change | $37k | $49k | $68k |
| Mid-range finishThe most common scope | $68k | $92k | $123k |
| High-end finishCustom materials and detail | $123k | $172k | $246k |
Source: Our Haus baseline estimates per square foot, adjusted with a Massachusetts cost index and a Brookline metro factor.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
| Line item | Low | Likely | High |
|---|---|---|---|
| Cabinets | $18k | $24k | $32k |
| Countertops | $6.2k | $8.4k | $11k |
| Appliances | $8.6k | $12k | $16k |
| Flooring | $4.3k | $5.9k | $7.8k |
| Plumbing & fixtures | $4.9k | $6.7k | $9.0k |
| Electrical & lighting | $3.7k | $5.0k | $6.7k |
| Drywall, paint, trim | $3.7k | $5.0k | $6.7k |
| Labor (general) | $9.9k | $13k | $18k |
| Permits & design | $2.5k | $3.4k | $4.5k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Early-1900s apartment buildings and row houses near Coolidge Corner and Brookline Village, many converted to condominiums, and large single-family houses in Fisher Hill, Pill Hill, and Chestnut Hill. Plaster walls, steam heat, and lead paint are standard in older buildings.
Common Brookline neighborhoods where this work comes up: Coolidge Corner, Brookline Village, Washington Square, Chestnut Hill, Fisher Hill, Pill Hill.
Authority: Town of Brookline Building Department
Permits are filed through the town's online portal. The Preservation Commission and preservation planners review full and partial demolition of all buildings in Brookline, so an addition that removes an exterior wall may need review before the building permit. The Cottage Farm, Pill Hill, Graffam-McKay, and Chestnut Hill North local historic districts add review for exterior changes. Condominium work also needs the association's approval.
Same Massachusetts rules as Boston: written contract over $1,000, Home Improvement Contractor registration, one-third deposit cap, and required start and completion dates in the contract.
Exterior work runs April through November. Preservation Commission meetings are monthly with set deadlines, so exterior projects that need review should start planning a season ahead.
Typical duration: 8–14 weeks on site once materials are in hand.
Layout, cabinet order, and every finish selection. Cabinet lead time drives the whole schedule — order before demolition.
Building permit plus separate electrical and plumbing permits. Historic-district review, where it applies, sits in front of this.
The scope-change window. Anything hidden — rot, old wiring, undersized framing — surfaces here.
Framing changes, plumbing and electrical rough, inspections before anything is closed up.
Board, tape, prime. Dust travels through the whole house during this phase.
Cabinets install, then counters are templated and fabricated — usually a 1–2 week gap before the stone arrives.
Backsplash, appliances, trim, lighting, final inspections, and the punch list.
A full kitchen remodel replaces cabinets, counters, appliances, flooring, and lighting, and usually touches plumbing and electrical. The spread between a modest refresh and a gut renovation with a moved wall is the widest of any room in the house.
Full checklist: what should be in a contractor's estimate.
We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Massachusetts registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.
Run a Brookline contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.
Run it through the quote range checker. We compare it against the Massachusetts cost index, flag line items that look high, and review the contract against Massachusetts home-improvement rules.
Check my quoteYes. Cabinet lead times commonly run six to twelve weeks, and demolishing a working kitchen before the cabinets are in the shop turns a schedule gap into weeks without a kitchen.
Industry cost-versus-value data consistently shows minor and mid-range kitchen remodels recovering a larger share of their cost than high-end ones. A $30,000 refresh usually returns a better ratio than a $120,000 gut, even though the gut may be the right call for how you live.