Somerville is the most densely populated city in New England, and that drives cost: tight lots, shared walls, permit parking for dumpsters, and Boston-area labor rates. Prices track Cambridge closely.
Our Haus isn't a contractor directory. We give you the local cost math, the permit reality, and the paperwork tools — the scope, the proposal comparison, and the vault your records live in.
Based on a 150 sq ft kitchen remodel scope, adjusted by the Massachusetts regional cost index and a Somerville metro multiplier of 1.10×. A 10% contingency reserve is included. These are budgeting estimates, not quotes.
| Somerville kitchen remodel | Low | Likely | High |
|---|---|---|---|
| Basic finishEntry-level materials, no layout change | $36k | $48k | $65k |
| Mid-range finishThe most common scope | $65k | $89k | $119k |
| High-end finishCustom materials and detail | $119k | $166k | $238k |
Source: Our Haus baseline estimates per square foot, adjusted with a Massachusetts cost index and a Somerville metro factor.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
| Line item | Low | Likely | High |
|---|---|---|---|
| Cabinets | $17k | $24k | $31k |
| Countertops | $5.9k | $8.1k | $11k |
| Appliances | $8.3k | $11k | $15k |
| Flooring | $4.2k | $5.7k | $7.6k |
| Plumbing & fixtures | $4.8k | $6.5k | $8.6k |
| Electrical & lighting | $3.6k | $4.9k | $6.5k |
| Drywall, paint, trim | $3.6k | $4.9k | $6.5k |
| Labor (general) | $9.5k | $13k | $17k |
| Permits & design | $2.4k | $3.2k | $4.3k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Triple-deckers and two-families built from the 1890s through the 1920s make up most of the city, many now split into condominiums. Expect balloon framing, plaster and lath, old steam heat, shared utilities, and lead-safe work rules on almost every job.
Common Somerville neighborhoods where this work comes up: Davis Square, Union Square, Teele Square, Winter Hill, Spring Hill, Ten Hills.
Authority: City of Somerville Inspectional Services Department, Building Division
Building permits are filed through the city's online portal, with separate trade permits. Demolishing a building over 75 years old goes through Demolition Review first. Properties in a local historic district need Historic Preservation Commission approval for exterior repairs and alterations. In condominium buildings, check the association's approval rules before booking a contractor.
Same Massachusetts rules as Boston: written contract over $1,000, Home Improvement Contractor registration, one-third deposit cap, and required start and completion dates in the contract.
Exterior work runs April through November. Street access and parking are tighter than the calendar, so dumpster and delivery permits need to be lined up early in the busy spring and summer months.
Typical duration: 8–14 weeks on site once materials are in hand.
Layout, cabinet order, and every finish selection. Cabinet lead time drives the whole schedule — order before demolition.
Building permit plus separate electrical and plumbing permits. Historic-district review, where it applies, sits in front of this.
The scope-change window. Anything hidden — rot, old wiring, undersized framing — surfaces here.
Framing changes, plumbing and electrical rough, inspections before anything is closed up.
Board, tape, prime. Dust travels through the whole house during this phase.
Cabinets install, then counters are templated and fabricated — usually a 1–2 week gap before the stone arrives.
Backsplash, appliances, trim, lighting, final inspections, and the punch list.
A full kitchen remodel replaces cabinets, counters, appliances, flooring, and lighting, and usually touches plumbing and electrical. The spread between a modest refresh and a gut renovation with a moved wall is the widest of any room in the house.
Full checklist: what should be in a contractor's estimate.
We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Massachusetts registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.
Run a Somerville contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.
Run it through the quote range checker. We compare it against the Massachusetts cost index, flag line items that look high, and review the contract against Massachusetts home-improvement rules.
Check my quoteYes. Cabinet lead times commonly run six to twelve weeks, and demolishing a working kitchen before the cabinets are in the shop turns a schedule gap into weeks without a kitchen.
Industry cost-versus-value data consistently shows minor and mid-range kitchen remodels recovering a larger share of their cost than high-end ones. A $30,000 refresh usually returns a better ratio than a $120,000 gut, even though the gut may be the right call for how you live.