A full kitchen remodel replaces cabinets, counters, appliances, flooring, and lighting, and usually touches plumbing and electrical. The spread between a modest refresh and a gut renovation with a moved wall is the widest of any room in the house.
A 150 sq ft kitchen remodel at a mid-range finish, with each town's cost factor applied and a 10% contingency included. Highest first. Budgeting estimates, not quotes.
| Town | Low | Likely | High |
|---|---|---|---|
| Cape Elizabeth, ME1.08× metro factor | $50k | $68k | $91k |
| Falmouth, ME1.07× metro factor | $50k | $68k | $90k |
| Portland, ME1.06× metro factor | $49k | $67k | $89k |
| Yarmouth, ME1.05× metro factor | $49k | $66k | $88k |
| Scarborough, ME1.04× metro factor | $48k | $66k | $88k |
| South Portland, ME1.03× metro factor | $48k | $65k | $87k |
| Freeport, ME1.02× metro factor | $47k | $64k | $86k |
| Westbrook, ME1.00× metro factor | $46k | $63k | $84k |
| Saco, ME0.99× metro factor | $46k | $62k | $83k |
| Brunswick, ME0.99× metro factor | $46k | $62k | $83k |
| Gorham, ME0.99× metro factor | $46k | $62k | $83k |
| Biddeford, ME0.98× metro factor | $45k | $62k | $82k |
| Windham, ME0.98× metro factor | $45k | $62k | $82k |
| Bangor, ME0.93× metro factor | $41k | $56k | $75k |
Source: Our Haus baseline estimates per square foot, adjusted with a Maine cost index and each town's metro factor.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Maine requires a written contract for home-construction or repair work over $3,000. The contract must include the contractor's name and address, the work and materials, the total price, a payment schedule, start and completion dates, a warranty statement, and a dispute-resolution clause (arbitration or mediation). Maine does not license general contractors, so verify insurance directly.
Rules change. Check with the state board or a lawyer before relying on a specific figure.
Yes. Cabinet lead times commonly run six to twelve weeks, and demolishing a working kitchen before the cabinets are in the shop turns a schedule gap into weeks without a kitchen.
Industry cost-versus-value data consistently shows minor and mid-range kitchen remodels recovering a larger share of their cost than high-end ones. A $30,000 refresh usually returns a better ratio than a $120,000 gut, even though the gut may be the right call for how you live.