Bathrooms are small but dense: plumbing, waterproofing, tile, ventilation, and electrical all land in a few dozen square feet. Cost per square foot runs higher than almost any other room, and the difference between a good and a bad job is mostly invisible waterproofing work.
A 60 sq ft bathroom remodel at a mid-range finish, with each town's cost factor applied and a 10% contingency included. Highest first. Budgeting estimates, not quotes.
| Town | Low | Likely | High |
|---|---|---|---|
| Stamford, CT1.10× metro factor | $30k | $41k | $56k |
| Norwalk, CT1.06× metro factor | $29k | $39k | $54k |
| Hartford, CT0.98× metro factor | $26k | $36k | $49k |
| Bridgeport, CT0.96× metro factor | $26k | $36k | $49k |
| New Haven, CT0.99× metro factor | $26k | $35k | $48k |
Source: Our Haus baseline estimates per square foot, adjusted with a Connecticut cost index and each town's metro factor.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Connecticut's Home Improvement Act requires a written contract for home-improvement jobs over $200, signed by both parties, with start and completion dates, the contractor's Home Improvement Contractor registration number, and a three-day right of cancellation notice. A contractor without a valid registration generally cannot enforce the contract.
Rules change. Check with the state board or a lawyer before relying on a specific figure.
Every trade has to work in the same tiny room in sequence, and the fixed costs — permits, waterproofing, a shower valve, a vanity, a toilet — do not shrink with the room. A 40-square-foot bathroom and a 70-square-foot bathroom often differ by only a few thousand dollars in total.
Plan on the full on-site duration, typically three to six weeks. Cure times for mortar, waterproofing, and grout are not compressible, and shower glass usually arrives a week or two after tile is finished.