Bathrooms are small but dense: plumbing, waterproofing, tile, ventilation, and electrical all land in a few dozen square feet. Cost per square foot runs higher than almost any other room, and the difference between a good and a bad job is mostly invisible waterproofing work.
A 60 sq ft bathroom remodel at a mid-range finish, with each town's cost factor applied and a 10% contingency included. Highest first. Budgeting estimates, not quotes.
| Town | Low | Likely | High |
|---|---|---|---|
| Cambridge, MA1.14× metro factor | $34k | $47k | $64k |
| Brookline, MA1.14× metro factor | $34k | $47k | $64k |
| Boston, MA1.12× metro factor | $34k | $46k | $63k |
| Newton, MA1.12× metro factor | $34k | $46k | $63k |
| Somerville, MA1.10× metro factor | $33k | $45k | $62k |
| Quincy, MA1.02× metro factor | $31k | $42k | $57k |
| Lowell, MA0.96× metro factor | $29k | $39k | $54k |
| Worcester, MA0.94× metro factor | $26k | $35k | $48k |
| Springfield, MA0.90× metro factor | $24k | $32k | $44k |
Source: Our Haus baseline estimates per square foot, adjusted with a Massachusetts cost index and each town's metro factor.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Massachusetts requires a written contract for residential work over $1,000, and the contractor must be registered under the Home Improvement Contractor (HIC) program. The contract must state the total price, a payment schedule, start and completion dates, and the contractor's HIC registration number. Deposits are capped at one third of the total price (or the cost of special-order materials, whichever is greater).
Rules change. Check with the state board or a lawyer before relying on a specific figure.
Every trade has to work in the same tiny room in sequence, and the fixed costs — permits, waterproofing, a shower valve, a vanity, a toilet — do not shrink with the room. A 40-square-foot bathroom and a 70-square-foot bathroom often differ by only a few thousand dollars in total.
Plan on the full on-site duration, typically three to six weeks. Cure times for mortar, waterproofing, and grout are not compressible, and shower glass usually arrives a week or two after tile is finished.