Updated 2026-01-15 · 2026 ranges
Bathrooms carry the highest cost per square foot of any room, and the reason is structural: every trade in the house has to work in sequence inside forty to seventy square feet, and a large share of the budget goes into waterproofing you will never see.
The bands below apply the same regional cost index used by our quote range checker, adjusted per metro, with a 10 percent contingency included. Use them to sanity-check a quote, not to replace one.
Based on a 60 sq ft scope at the New England regional average, with a 10% contingency included. Estimates for budgeting, not quotes.
| Finish level | Low | Likely | High |
|---|---|---|---|
| Basic finishEntry-level materials, no layout change | $12k | $17k | $23k |
| Mid-range finishThe most common scope | $23k | $31k | $43k |
| High-end finishCustom materials and detail | $43k | $56k | $79k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Same scope, mid-range finish, with each state's cost-of-construction index applied.
| State | Low | Likely | High |
|---|---|---|---|
| MassachusettsMA | $30k | $41k | $56k |
| ConnecticutCT | $27k | $36k | $50k |
| Rhode IslandRI | $26k | $35k | $48k |
| New HampshireNH | $24k | $33k | $45k |
| VermontVT | $24k | $32k | $44k |
| MaineME | $24k | $32k | $44k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Regional average, mid-range finish. Use this to sanity-check whether a bid's internal proportions make sense — a cabinet or tile line far outside these shares is worth a question.
| Line item | Low | Likely | High |
|---|---|---|---|
| Tile & shower/tub | $4.6k | $6.3k | $8.6k |
| Vanity & countertop | $2.5k | $3.4k | $4.7k |
| Plumbing fixtures | $2.9k | $4.0k | $5.5k |
| Flooring | $1.5k | $2.0k | $2.7k |
| Electrical & lighting | $1.3k | $1.7k | $2.3k |
| Drywall, paint, trim | $1.5k | $2.0k | $2.7k |
| Labor (general) | $5.9k | $8.0k | $11k |
| Permits & design | $840 | $1.1k | $1.6k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Tile and the shower or tub assembly are usually the largest material line, and labor is close behind — often more than a quarter of the total on its own, because tile setting is slow, skilled work.
Fixture selection is the easiest place to move a budget in either direction. A shower valve and trim set can range from a few hundred dollars to several thousand for the same function.
The cheapest meaningful upgrade in a New England bathroom is a properly sized exhaust fan ducted to the outside. Old houses vent into attics or nowhere at all, and that is what causes the mold that forces the next remodel.
A quote that says "waterproof shower" without naming the system is not comparable to one that specifies a sheet or liquid membrane. That is the difference between a shower that lasts twenty-five years and one that fails in six.
Ask for a per-square-foot unit price for subfloor repair in writing. In a pre-1950 home there is a meaningful chance the floor under the toilet or shower has been wet for a long time, and a stated unit price turns a nasty surprise into arithmetic.
The quote range checker runs your quote through this same cost engine using your ZIP, then flags line items that look high and reviews the contract against your state's home-improvement rules.
Check my quoteFor a typical 60-square-foot full bathroom at a mid-range finish, the range in the table above covers most jobs. Moving the toilet or converting a tub to a curbless shower pushes toward the top of the band or past it.
Usually yes, on a per-bathroom basis. Mobilization, permits, and material delivery are shared, and the trades run the same sequence twice. Expect savings in the range of ten to fifteen percent on the second room, not fifty.
Higher than any other room. The fixed content of a bathroom — valve, pan, vanity, toilet, waterproofing, ventilation — does not shrink with the room, so a very small bathroom can have a very high per-square-foot figure and a perfectly normal total.