A deck is the most permit-sensitive outdoor project a homeowner takes on — footings below frost line, ledger attachment to the house, and railings are all inspected, and all three are where cheap bids cut corners. In New England the frost depth alone separates a real bid from a guess.
A 300 sq ft deck building at a mid-range finish, with each town's cost factor applied and a 10% contingency included. Highest first. Budgeting estimates, not quotes.
| Town | Low | Likely | High |
|---|---|---|---|
| Cambridge, MA1.14× metro factor | $22k | $37k | $59k |
| Brookline, MA1.14× metro factor | $22k | $37k | $59k |
| Boston, MA1.12× metro factor | $22k | $36k | $58k |
| Newton, MA1.12× metro factor | $22k | $36k | $58k |
| Somerville, MA1.10× metro factor | $21k | $36k | $57k |
| Quincy, MA1.02× metro factor | $20k | $33k | $53k |
| Lowell, MA0.96× metro factor | $19k | $31k | $50k |
| Worcester, MA0.94× metro factor | $17k | $28k | $45k |
| Springfield, MA0.90× metro factor | $15k | $25k | $41k |
Source: Our Haus baseline estimates per square foot, adjusted with a Massachusetts cost index and each town's metro factor.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Massachusetts requires a written contract for residential work over $1,000, and the contractor must be registered under the Home Improvement Contractor (HIC) program. The contract must state the total price, a payment schedule, start and completion dates, and the contractor's HIC registration number. Deposits are capped at one third of the total price (or the cost of special-order materials, whichever is greater).
Rules change. Check with the state board or a lawyer before relying on a specific figure.
Almost always, yes, once the deck attaches to the house or sits more than a couple of feet above grade. Footing and final inspections are standard. An unpermitted deck is a real problem at resale and with insurance if someone is hurt on it.
For most New England homeowners, yes on maintenance alone: no staining cycle and better resistance to freeze-thaw. The tradeoffs are heat retention in summer sun and a higher upfront line, plus the framing requirement of tighter joist spacing that should appear in the quote.