An addition is new construction attached to an existing building, which means it carries every trade at once plus the hardest part — tying new structure, roof, and systems into old ones that were never built to current code.
A 400 sq ft home addition at a mid-range finish, with each town's cost factor applied and a 10% contingency included. Highest first. Budgeting estimates, not quotes.
| Town | Low | Likely | High |
|---|---|---|---|
| Cambridge, MA1.14× metro factor | $181k | $246k | $329k |
| Brookline, MA1.14× metro factor | $181k | $246k | $329k |
| Boston, MA1.12× metro factor | $178k | $242k | $323k |
| Newton, MA1.12× metro factor | $178k | $242k | $323k |
| Somerville, MA1.10× metro factor | $174k | $238k | $317k |
| Quincy, MA1.02× metro factor | $162k | $220k | $294k |
| Lowell, MA0.96× metro factor | $152k | $208k | $277k |
| Worcester, MA0.94× metro factor | $136k | $186k | $248k |
| Springfield, MA0.90× metro factor | $124k | $169k | $226k |
Source: Our Haus baseline estimates per square foot, adjusted with a Massachusetts cost index and each town's metro factor.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Massachusetts requires a written contract for residential work over $1,000, and the contractor must be registered under the Home Improvement Contractor (HIC) program. The contract must state the total price, a payment schedule, start and completion dates, and the contractor's HIC registration number. Deposits are capped at one third of the total price (or the cost of special-order materials, whichever is greater).
Rules change. Check with the state board or a lawyer before relying on a specific figure.
Sometimes. Compare the all-in addition cost — design, permits, construction, and the months of disruption — against transaction costs on a move, which typically run 8 to 10 percent of a sale price plus the price difference on the new house. In tight New England markets the addition often wins; in a soft market it often does not.
For anything structural or anything requiring zoning relief, yes — and most municipalities will require stamped drawings for the permit anyway. A design-build contractor can supply this, but confirm who holds the stamp.