Updated 2026-08-12
Repair negotiations fail for a predictable reason: the buyer sends a long list of everything the inspector wrote down, and the seller reads it as an attempt to renegotiate the price after the fact. Sellers accept requests that are short, documented, and clearly about condition rather than about regret.
The other predictable failure is asking without a number. "The seller should address the roof" invites an argument. "Two contractor quotes for roof replacement, $18,400 and $21,000, attached — we are asking for a $15,000 credit" invites a counter-offer, which is where you want to be.
Safety hazards, active water intrusion, structural findings, systems that are failing rather than aging, and anything a specialist confirmed in writing. If you cannot say why an item matters in one sentence without referencing your feelings about the house, it does not go on the list.
You need to know scale before you can decide what to ask for. Then, for any item likely to exceed roughly one percent of the purchase price, get written contractor quotes. Attaching a quote moves the conversation from whether a number is fair to how the number gets split.
A closing credit is usually the strongest form: you control the contractor and the timing, and there is nothing to inspect before closing. Ask for a completed repair when a lender, insurer, or municipality requires it. Ask for a price reduction when the item is a long-term budget reality rather than an immediate fix — an aging roof, for example — and note that a price reduction changes your loan basis while a credit does not.
A seller is not obligated to hand you a new roof because the existing one is nineteen years old and functioning. The strongest version of that ask is a partial credit reflecting the remaining life, framed exactly that way. Buyers who ask for full replacement on a working system usually get nothing on it.
For each item: the report page or the specialist's letter, a photo if it helps, and the quote. Three pages of documentation is more persuasive than forty pages of report, because the seller's agent will read three pages and will skim forty.
State the total you are requesting and the form. Sellers respond far better to a single number than to an itemised list they have to price themselves, and giving them a number to counter keeps the conversation moving inside your contingency window.
You now know what the house needs and roughly what it costs. The question is only whether the price still works with that added. Ten weeks of effort and an already-scheduled move are not reasons to accept a $30,000 structural finding, and they are also not reasons to walk over a $2,000 one.
Credits, repairs, and price reductions all need to be an amendment signed by both parties, with the repairs specified by scope and with a requirement that permits are pulled and receipts provided at closing. A verbal agreement between agents is not enforceable at the closing table.
Estimated ranges to size the ask before quotes come in. Always negotiate against a written contractor quote when the item is large — these ranges tell you scale, not what a specific contractor will charge.
| Repair item | Low | Likely | High |
|---|---|---|---|
| Roof replacement (asphalt shingle)one 2,000 sq ft roof, tear-off and replace | $9.0k | $15k | $26k |
| Furnace or boiler replacementone unit, installed | $4.5k | $7.0k | $12k |
| AC or heat pump replacementone whole-home system, installed | $6.0k | $11k | $20k |
| Water heater replacementone 50-gallon tank unit, installed | $1.2k | $2.1k | $4.2k |
| Electrical panel upgradeone 200-amp service upgrade | $1.8k | $3.2k | $6.0k |
| Sump pump and perimeter drainageone basement system | $1.2k | $3.5k | $12k |
| Chimney repair (repoint, crown, liner)one chimney | $500 | $2.2k | $9.0k |
| Window replacementper window, standard double-hung insert | $550 | $950 | $1.8k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
Free and no account needed. We turn the PDF into a prioritised list of findings, the questions worth asking your inspector and your agent, and estimated repair cost ranges for the items that were flagged — using the same cost engine behind these tables.
Read my inspection reportThere is no reliable average, because it depends entirely on the findings, the market, and the seller's alternatives. What is consistent is the shape of successful requests: a small number of documented, condition-based items with quotes attached, asked for as a credit. Long lists of cosmetic items are the most common reason a seller refuses everything.
A credit in most cases. You choose the contractor, you set the standard, and you avoid rushed work by a seller who will not live with the result. Ask for the completed repair when a third party — lender, insurer, or the building department — requires the work done before closing.
Yes, unless the contract says otherwise. The inspection contingency gives you the right to withdraw, not the right to compel repairs. That is exactly why the decision to walk should be made against the priced total rather than in the moment.
Asking for full replacement on a functioning roof rarely works. A partial credit framed around remaining service life is the version sellers accept, and it is also the honest ask — you are buying a house with a roof that has a few years left, and the price already reflected that.
Usually not, and practice varies by state and by contract. Many buyers share only the pages supporting their request. Note that in some states, sharing findings creates a disclosure obligation for the seller toward future buyers if your deal falls through — worth asking your agent about before you send the whole document.