Scarborough is the fastest-growing town in Greater Portland, and that demand shows up in contractor availability more than in hourly rates. Crews are booked deep, so the practical cost of waiting — or of paying for an off-season start — is often the real variable here.
Our Haus isn't a contractor directory. We give you the local cost math, the permit reality, and the paperwork tools — the scope, the proposal comparison, and the vault your records live in.
Based on a 60 sq ft bathroom remodel scope, adjusted by the Maine regional cost index and a Scarborough metro multiplier of 1.04×. A 10% contingency reserve is included. These are budgeting estimates, not quotes.
| Scarborough bathroom remodel | Low | Likely | High |
|---|---|---|---|
| Basic finishEntry-level materials, no layout change | $12k | $18k | $25k |
| Mid-range finishThe most common scope | $25k | $33k | $46k |
| High-end finishCustom materials and detail | $46k | $60k | $84k |
Source: Our Haus cost engine — per-square-foot bands from public industry data (Cost vs. Value, NAHB, RSMeans-derived regional indices), adjusted for Maine and the Scarborough metro.
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
| Line item | Low | Likely | High |
|---|---|---|---|
| Tile & shower/tub | $4.9k | $6.7k | $9.1k |
| Vanity & countertop | $2.7k | $3.6k | $5.0k |
| Plumbing fixtures | $3.1k | $4.2k | $5.8k |
| Flooring | $1.6k | $2.1k | $2.9k |
| Electrical & lighting | $1.3k | $1.8k | $2.5k |
| Drywall, paint, trim | $1.6k | $2.1k | $2.9k |
| Labor (general) | $6.2k | $8.5k | $12k |
| Permits & design | $891 | $1.2k | $1.7k |
Estimated range — based on BLS OEWS national average wages and BLS PPI material indexes applied to Our Haus baseline unit costs, as of June 2026. Estimates are shown as a range and help set expectations. They are not a quote, a verified price, or an appraisal of what a contractor will charge.
A wide spread: 1960s–1990s subdivisions inland, older farmhouse and cottage stock in Dunstan and Oak Hill, and coastal homes at Higgins Beach, Pine Point, and Prouts Neck that sit in flood and shoreland zones. Beach-area properties carry elevation, flood-vent, and salt-exposure requirements that inland quotes never include.
Common Scarborough neighborhoods where this work comes up: Oak Hill, Pine Point, Higgins Beach, Dunstan, Prouts Neck, Eight Corners.
Authority: Town of Scarborough Building Inspections and Code Enforcement
Additions and structural work need a building permit plus zoning review. Coastal and marsh-adjacent parcels — a large share of the town — fall under shoreland zoning and FEMA flood-zone rules, which can dictate elevation and construction method, not just approval. Confirm the flood zone before design.
Maine requires a written contract for home-construction or repair work over $3,000. The contract must include the contractor's name and address, the work and materials, the total price, a payment schedule, start and completion dates, a warranty statement, and notice of the state's contractor-dispute mediation program. Maine does not license general contractors, so verify insurance directly with the carrier.
Coastal exterior work concentrates from late April through October. Summer traffic and beach-season parking around Pine Point and Higgins Beach genuinely slow deliveries and crew access, which is why some contractors price shoulder-season work lower.
Typical duration: 3–6 weeks on site.
Fixture and tile selection. Order everything before demolition — a backordered valve stops the whole job.
Plumbing and electrical permits; a building permit if framing changes.
Down to studs. Subfloor and framing condition is assessed here.
Plumbing and electrical rough, fan duct, blocking for grab bars, then inspection.
Backer board, waterproof membrane, pan slope, then tile and grout with cure time between steps.
Vanity, toilet, trim, glass measurement — shower glass is typically ordered after tile is set and adds 1–2 weeks.
Bathrooms are small but dense: plumbing, waterproofing, tile, ventilation, and electrical all land in a few dozen square feet. Cost per square foot runs higher than almost any other room, and the difference between a good and a bad job is mostly invisible waterproofing work.
Full checklist: what should be in a contractor's estimate.
We don't keep a contractor directory, and we won't pretend to. The dependable process is to gather two or three referrals locally, check the Maine registration or license rules above, confirm general liability and workers' compensation directly with each carrier, then compare the written proposals side by side against the ranges on this page.
Run a Scarborough contractor's business? You can publish a free Our Haus profile with your license, insurance dates, service area, and work photos, and share it by link or QR code.
Run it through the quote range checker. We compare it against the Maine cost index, flag line items that look high, and review the contract against Maine home-improvement rules.
Check my quoteEvery trade has to work in the same tiny room in sequence, and the fixed costs — permits, waterproofing, a shower valve, a vanity, a toilet — do not shrink with the room. A 40-square-foot bathroom and a 70-square-foot bathroom often differ by only a few thousand dollars in total.
Plan on the full on-site duration, typically three to six weeks. Cure times for mortar, waterproofing, and grout are not compressible, and shower glass usually arrives a week or two after tile is finished.